How The Test Centre Was Built
Initial soil resistivity tests.
The first stage of groundwork begins on the land beside the Headquarters.
First delivery of High Voltage equipment.
Transformer being unloaded.
Site drainage installation.
First cable track excavated.
Laying of first cable.
Start of the civil work for HV enclosure.
Installation of HV transformer.
Installation of HV switchgear.
HV equipment installed on plinth.
Arrival of GRP enclosure for LV switchboard.
Installation of LV switchboard.
Completion of first LV breeches joints.
Installation of LV fault trough
Overview of the Test Centre.
Overview of the Test Centre.